Short explanations of topics that come up on the construction site every day: invoices, contracts, additional services, documentation and data.
Articles
All posts
Money & invoicing
Billing, payment, tax and security: so your money arrives on time.
Create Invoices, Quotes and Nachtrag
Which document do I need, and how is it created? Invoice, quote, Nachtrag and letter – from the job in your own words to the German document.
What Is an Abschlagsrechnung under VOB/B?
What an Abschlagsrechnung (interim invoice) is, when you can issue one under VOB/B and what the document must contain.
What to do if the client doesn't pay?
The client has not paid the invoice: which steps the contract and VOB/B provide for and where to start.
Offer, Order and Invoice: Differences
How offer, order and invoice differ and why they must not be confused.
Construction withholding tax and the exemption certificate under § 48 EStG
Who has to withhold 15 per cent, which de minimis limits apply, how the exemption certificate (Freistellungsbescheinigung) protects you and which deadlines apply for the filing.
Security for tradespeople under § 650f BGB: how to demand it
When you, as a tradesperson, can demand security for your unpaid remuneration, how high it is, what deadline to set and what applies if the client refuses.
Schlussrechnung (final invoice) under VOB/B: deadline, verifiability, payment
By when the final invoice must go out, what verifiable means, when the money falls due and how the reservation on final payment works.
Handling Sicherheitseinbehalt and Bürgschaft (security retention and surety bond) under VOB/B correctly
How high the retention may be, what the client must do with the money, when you can replace it and when the security must be returned.
Billing hourly-rate work (Stundenlohnarbeiten): agreement, time sheets, invoice
When hourly-rate work is paid for, how hourly-rate time sheets (Stundenlohnzettel) work, which deadlines apply for their return and for the invoice and what is at risk if sheets are missing.
Invoice without VAT: § 13b UStG for construction services (reverse charge)
When the client owes the VAT, what note the invoice needs, which certificate you should ask the customer for and what applies in the event of a mistake.
Abschlagsrechnung under § 632a BGB: BGB contract and consumer construction contract
When you can demand a progress payment without VOB/B, how to prove the work and what applies to the consumer construction contract under § 650m BGB.
Aufmaß under VOB/C: deduction and over-measuring by trade
How openings and recesses are treated in the Aufmaß, where the rules are found (ATV, section 5 Abrechnung) and what to watch for in each trade.
Contract & disputes
Deadlines, notices, acceptance and warranty: what counts in a dispute.
Construction Contract Review
Three points in a construction contract you should always check: acceptance, warranty and retention – with references from VOB/B and BGB.
VOB/B and BGB Questions: Check the Source
Which set of rules applies, and how do you recognise a reliable answer? Reference, wording, version – and how BauWalker shows sources.
How a Nachtrag Works in a Construction Contract
When a Nachtrag arises, what belongs in the justification and how to avoid disputes.
VOB/B explained simply
What the VOB/B is, when it applies and how it differs from an ordinary BGB contract.
Documenting Additional Construction Services
How to record additional services so that they get paid.
GDPR/DSGVO and AI in Construction
What to observe under the GDPR/DSGVO when a construction company uses AI for documents and correspondence.
Notice of hindrance (Behinderungsanzeige) under § 6 VOB/B: deadline, content, consequences
When you must give notice of a hindrance, what the notice must contain and which claims to an extension of time and to compensation depend on it.
Acceptance of construction work: formal, deemed, with reservations
How acceptance (Abnahme) works under VOB/B and the BGB, when it is deemed to have taken place, what belongs in the acceptance report and what it means for payment, burden of proof and limitation.
Bedenkenanmeldung under § 4 para. 3 VOB/B: when you are liable if you stay silent
When you must raise concerns about the design, instructions, client-supplied material or earlier work, what the notice contains and how it limits your liability.
Warranty in construction (Gewährleistung): 4 or 5 years? VOB/B and BGB compared
How long defect claims for construction work take to become time-barred, when the period starts, what a notice of defects (Mängelrüge) achieves and which rights the client has.
Termination of a construction contract (Kündigung): VOB/B and BGB at a glance
When client and contractor may terminate, which periods and written form apply and how the account is settled afterwards.
Material prices are rising: what the construction contract allows and what it does not
When you can pass on extra costs from material prices under a fixed price or lump sum, what role price escalation clauses play and how to protect yourself in the quote.
Construction site & practice
Technology and organisation on site, with liability and evidence in mind.
Organising Construction Project Documents
Contracts, quotes, invoices and minutes belong to the project, not in a folder of files: this is how you keep an overview.
Aufmaß from the Plan: Rooms and Areas
Determine rooms, wall and floor areas from the floor plan – and calculate living area under the WoFlV. This is how Aufmaß with AI works.
Site Meeting Minutes: Decisions, Tasks
What belongs in meeting minutes, and how does a conversation become a clear task list? With a note on recording (§ 201 StGB).
What must a Bautagesbericht contain?
What to record in the Bautagesbericht (daily site report) so that it helps in disputes and with Nachträge.
Duties of a Site Manager (Bauleiter)
The site manager's main duties: monitoring schedules, quality, documentation and decisions.
WoFlV and living-space calculation
How living space is calculated under the WoFlV and where deviations most often occur.
Renovating old buildings: recognising asbestos and acting correctly (TRGS 519)
Where asbestos hides in buildings from before 1993, what to do when you suspect it, what notification and expertise TRGS 519 requires and how to protect yourself contractually if you find it.
Vapour retarder or vapour barrier (Dampfbremse or Dampfsperre): difference, use and design mistakes
What the sd value and airtightness mean, when to use a vapour retarder, a vapour barrier or a humidity-variable membrane, and which execution mistakes later end up as a defect.
Anchors and fixings: substrate, ETA and proof for tradespeople
How to select fixings in concrete and masonry, when engineered design is required, what role the ETA plays and how to document execution and proof.
Screed: checking readiness for flooring, CM measurement and drying time correctly
When a screed is ready for flooring (Belegreife), how the CM measurement works, which guide values apply to cement and calcium sulphate screed and what the measurement record must contain.
Mould after renovation: causes, ventilation concept and liability
Why mould appears after window replacement and insulation, when a ventilation concept is needed, how to measure the causes and how to protect yourself as a tradesperson.
Templates & checklists
Samples and checklists ready to use.
Checklist: acceptance report (Abnahmeprotokoll) for construction work
Checklist and sample text for an acceptance report with defects list, reservations, contractual penalty, documents and signatures, to take over and adapt.
Checklist: documents on site and in the project folder
Which documents you should have ready for each construction project before it starts, during execution and after acceptance, so that deadlines, claims and evidence can be proven.
Sample: notice of hindrance (Behinderungsanzeige) under § 6 VOB/B
Free sample of a notice of hindrance to copy and adapt, with filling-in help, mandatory components and notes on delivery. The letter itself stays in German.
Aufmaßblatt: template and mandatory details for the Aufmaß
What belongs in an Aufmaßblatt, how a joint Aufmaß proceeds and a template to copy with columns for room, dimensions, deductions and area.
Show us a task – and we'll show you how BauWalker can work with it.
BauWalker helps you understand the situation faster, but does not replace a lawyer, Steuerberater or other qualified professional.